THE PRIME MINISTER OF GOVERNMENT | SOCIALIST REPUBLIC OF VIET NAM |
No: 95/2001/QD-TTg | Hanoi, June 22, 2001 |
DECISION
RATIFYING THE PLANNING ON VIETNAM ELECTRICITY DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT
THE PRIME MINISTER
Pursuant to the Law on Organization of the Government of September 30, 1992;
At the proposal of Vietnam Electricity Corporation (Official Dispatch No.149 EVN/HDQT-KH of June 21, 2000); considering the State Evaluation Council’s opinions on investment projects (Official Dispatch No.95/TDNN of November 24, 2000), and opinions of the relevant ministries and branches regarding the ratification of the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account,
DECIDES:
Article 1.- To ratify the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account (called Electricity Planning V for short) with the following major contents:
1. On the demand for load:
To firmly develop, raise the quality of, and fully satisfy the demand for, load in service of people’s daily life as well as socio-economic development, security and defense; to meet the requirements of national industrialization and modernization. The power plants throughout the country are expected to produce between 45 and 50 billion kWh, by the end of 2005, 70 -80 billion kWh by 2010 and 160-200 billion kWh by 2020.
2. On the development of power sources:
a/ The development of power sources must satisfy the above-said load demand, ensuring the safe, qualitative, stable, efficient and rational supply of electricity for socio-economic development. To fully exploit energy sources with economic efficiency such as hydroelectric power, gas-fired thermal power, coal-fired thermal power and oil-fired thermal power, as well as new forms of energy..., in combination with the step-by-step reasonable exchange of electricity with regional countries. To give priority to the building of hydroelectric power plants with integrated benefits such as flood fighting, water supply, electricity production. To develop small-sized hydroelectric power plants, wind power, solar power...in areas far from power grids as well as mountain, border and island regions.
b/ The balance of power sources must take into account projects on the construction with intensive investment and technological renovation of the currently operating plants; meet the environmental standards and use modern technologies for the new power plants.
- To combine power sources invested in forms of independent power plants (IPP), BOT power plants or joint ventures and exchange electricity with the neighboring countries... in order to supply electricity for each region and the whole electric system.
- To ensure that the total capacity of foreign-invested projects in forms of BOT, IPP or joint ventures... account for not more than 20% of the system’s maximum capacity.
c/ Power sources must be structured in compatibility with the practical situation and fuel sources, ensuring the system’s exploitation efficacy and characteristics of each locality so as to take initiative in the supply of electricity based on the requirements of socio-economic development and people’s daily life in the dry and rainy seasons, including the years when hydroelectric power plants fall short of water as well as the high-demand and low-demand hours, thereby ensuring enough water sources for agriculture and flood fighting when necessary.
d/ To boost the power source projects according to the set plan and schedule (see the list in Appendix 1 to this Decision).
The capacity, location and time for the construction of power source projects shall be decided by the competent authorities when approving the feasibility study report of each specific project.
3. On the development of power grids:
a/ To build power grids of from high tension to low tension synchronously with power sources. To overcome the current state of unsafe, obsolete, patchy and high-loss power grids.
b/ The competence to decide investment in power grid development projects is prescribed as follows:
- The competence to decide investment in power transmission lines and transformer stations shall comply with the general provisions of the Regulation on Investment and Construction Management (the Government’s Decree No.52/1999/ND-CP of July 8, 1999 and Decree No.12/2000/ND-CP of May 5, 2000). For projects with investment decided by branches and localities, the electricity branch’s agreement is required.
- Projects on transformer stations and power transmission lines of 110 kV or under shall be decided by the Managing Board of the Vietnam Electricity Corporation in accordance with this Decision.
- For power grid development projects for the years after 2010, the Ministry of Industry shall coordinate with branches and localities in directing Vietnam Electricity Corporation to specify them according to the planning and plans before submitting them to the Prime Minister for consideration and decision.
c/ The power grid development projects shall comply with the list in Appendix 2 to this Decision.
4. On the supply of electricity for rural and mountainous areas:
a/ The Ministry of Industry shall coordinate with the concerned branches and localities in directing Vietnam Electricity Corporation to continue implementing the Prime Minister’s Decision No.22/1999/QD-TTg of February 13, 1999 ratifying the project on rural electricity and Decision No.294/QD-TTg of April 7, 2000 ratifying investment in the project on rural energy according to the set plan and schedule.
b/ The Ministry of Industry shall coordinate with branches and localities in elaborating a plan on the supply of electricity for deep-lying, remote, border and island areas, proposing mechanisms and policies for effective implementation, and submit it to the Prime Minister for consideration and decision. The plan must classify areas to be supplied with electricity from the national electricity system and areas to be supplied with on-the-spot electricity from diesel, wind or solar power source, from small-sized hydroelectric power plants or geothermal sources... For the areas to be supplied with electricity from the national electricity system, where, however, the on-spot power sources can be developed efficiently, such sources should be considered for development.
5. On investment capital sources:
a/ The Vietnam Electricity Corporation shall play a key role in supplying electricity for socio-economic development and people’s daily life. It may mobilize all capital sources for investment in power source and grid projects according to mechanism of self-borrowing and self-repaying (borrowing ODA capital, credit capital inside and outside the country, borrowing export credit from equipment suppliers and capital for equipment procurement to be repaid with commodities...) and continue observing the mechanism whereby the central bodies, localities, State and people jointly develop rural power grids.
b/ To encourage domestic and foreign investors to take part in building power source and power distribution projects in the investment forms of independent power plants (IPP), build-operate-transfer (BOT) contracts, build-transfer (BT) contracts, build-transfer-operate (BTO) contracts, joint ventures or joint stock companies...
6. On financial mechanism:
a/ To allow the Vietnam Electricity Corporation to retain the annual capital use levy, which constitutes a source of State budget capital allocated for investment in building power projects.
b/ To carry out plan on the rational adjustment of electricity prices from now to 2005.
7. On the renovation of managerial organization and raising of the electricity branch’s operation efficiency:
a/ The Vietnam Electricity Corporation shall continue restructuring its organization, reforming administrative procedures and dividing responsibility for investment decision with a view to raising the production and business efficiency to meet the requirements of electricity development in the coming period.
b/ The Vietnam Electricity Corporation shall invest in boosting the domestic manufacture of electric equipment, first of all focusing on the manufacture of complete equipment for medium- and low-voltage grids, then proceeding to manufacture complete equipment for 110-220 kV grids, gradually reducing the volume of equipment imported from overseas.
c/ The Ministry of Industry, branches and localities shall enhance the State management and draw up specific regulations according to their respective competence so that different economic sectors may take part in electricity investment and business to meet the country’s increasing demand.
Article 2.- Tasks of the concerned ministries, branches and localities and The Vietnam Electricity Corporation:
1. The Ministry of Planning and Investment:
To coordinate with the concerned ministries, branches and localities in studying and submitting to the Prime Minister for consideration and decision:
- The national strategy and policy on energy.
- The planning on the rational exploitation and combined use of the country’s rivers and other energy sources.
2. The Ministry of Industry:
a/ To direct the electricity branch to implement Electricity Planning V according to the set plan and schedule. To direct the Vietnam Electricity Corporation to work out a plan on organizational restructure in line with the branch development planning in the next 10 years before submitting it to the Prime Minister for approval.
b/ To regularly evaluate and update the demand for load and fuel for electricity production so as to work out a program on rational development of power sources and grids to meet the whole country’s demand after 2005. In case of big changes in the demand for load and capability of supplying fuel sources for electricity production, the Ministry should take initiative in calculating and promptly adjusting Electricity Planning V and submit it to the Prime Minister for approval.
c/ To assume the prime responsibility and coordinate with the concerned ministries and branches in promptly promulgating legal documents related to the electricity branch’s activities; finalizing the Bill on Electricity so as to report it to the Government for submission to the National Assembly for promulgation according to the set plan.
d/ To assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment, the Ministry of Construction and the Ministry of Planning and Investment in further materializing the program on the electricity "demand-supply management" (DSM), which puts forth incentive policies in combination with propagation, education, inspection and supervision... for the effective implementation of the DSM program.
e/ To assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment and concerned agencies in finalizing the pre-feasibility study report for the nuclear power plant project, and submit it to the Prime Minister for consideration and approval.
f/ To assume the prime responsibility and coordinate with the ministries and branches in directing the exchange of electricity with neighboring countries and Vietnam’s participation in the electricity system linking countries in Mekong river basin.
g/ To assume the prime responsibility and coordinate with the concerned ministries and branches in organizing the study and perfection of the method of elaborating electricity planning for the following period along the direction of optimizing technologies and renovating the long-term plan elaboration work in service of the adjustment and elaboration of the electricity branch development planning in the coming period.
h/ To direct the Vietnam Electricity Corporation to work out the hydroelectric cascade planning; guide economic sectors to take part in the investment and business of small and medium hydroelectric power projects. Cases falling beyond its competence shall be reported to the Prime Minister for consideration and decision.
i/ To assume the prime responsibility and coordinate with the concerned ministries, branches and localities in directing the exchange of electricity with neighboring countries and Vietnam’s participation in the electricity system linking countries in the Mekong river basin.
3. The Vietnam Electricity Corporation:
a/ To take the prime responsibility for ensuring the stable, safe and sustainable supply of electricity for socio-economic development and people’s daily life.
b/ To implement solutions to reduce electricity loss to around 10% by 2010; raise the capacity and increase the number of operation hours of power plants; control the load so as to raise the business efficiency; realize the program on saving electricity in production and consumption, saving investment capital right in the Corporation and the entire society for the sustainable development of the electricity branch.
Article 3.- The Minister of Industry, the heads of the concerned ministries and branches and the presidents of the People’s Committees of the provinces and centrally-run cities, the Managing Board and the general director of Vietnam Electricity Corporation shall have to implement this Decision.
| PRIME MINISTER |
APPENDIX I
PROGRAM ON POWER SOURCE DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT
(Issued together with the Prime Minister’s Decision No.95/2001/QD-TTg of June 22, 2001)
I. POWER SOURCES EXPECTED TO OPERATE IN THE 2001-2005 PERIOD
Names of plants Capacity (MW) Years of completion
a/ Power sources managed by the Vietnam Electricity Corporation:
1. Phu My 1 (mixed gas turbines ) 1,090 MW 2001
2. Pha Lai 2 (coal-fired thermal power plant) 600 MW 2001
3. Ialy hydroelectric power plant (2 remaining units) 360 MW (720 MW) 2001
4. Ham Thuan- Da Mi hydroelectric power plant 475 MW 2001
5. Steam drum 306-2 Ba Ria 56 MW 2002
6. Phu My 2- 1 (Steam drum) 143 MW 2003
7. Phu My 4 (mixed gas turbines ) 450 MW 2002-2003
8. Expanded Phu My 2-1 (Steam drum) 140 MW 2003
9. Expanded Uong Bi (coal-fired thermal power plant) 300 MW 2004-2005
10. O Mon (Oil-gas) 600 MW 2004-2005
11. Dai Ninh (hydroelectric power plant) 300 MW 2005
12. Rao Quan 70 MW 2005
b/ BOT power sources:
1. Can Don (hydroelectric power plant) 72 MW 2003
2. Phu My 3 720 MW 2003-2004
3. Phu My 2-2 * 720 MW 2004
c/ IPP power sources:
1. Na Duong (coal) 100 MW 2003-2004
2. Cao Ngan (coal) 100 MW 2003-2004
3. Ca Mau (mixed gas turbines ) 720 MW 2005-2006
4. Cam Pha thermoelectric power plant (coal) 300 MW 2004-2005
Note: * Where the negotiation on Phu My 2-2 contract fails, the Vietnam Electricity Corporation shall look for capital sources to build the plant.
II. POWER SOURCES EXPECTED TO OPERATE IN THE 2006-2010 PERIOD
Names of plants Capacity (MW) Years of operation
and completion
a/ Hydroelectric power sources:
1. Cua Dat 120 MW 2006-2007
2. Se San 3 273 MW 2006-2007
3. Na Hang (Dai Thi) 300 MW 2006
4. A Vuong 1 170 MW 2007-2008
5. Plei Krong 120 MW 2007-2008
6. Ban Mai (Ban La line) 260 MW 2008-2009
7. Dong Nai 3 & 4 510 MW 2008-2009
8. An Khe + Ka Nak 155 MW 2008-2010
9. Buon Kuop 280 MW 2008-2010
10. Ba Ha river 200 MW 2008-2010
11. Tranh river 2 200 MW 2008-2010
12. Son La (to be built according to the Xth National Assembly’s resolution at its 9th session).
b/ Thermoelectric power sources for which the feasibility study reports shall be elaborated for submission and approval:
1. Hai Phong thermoelectric power plant (coal) 600 MW 2006-2008
2. Lang Bang thermoelectric power plant (coal) 300 MW 2008-2010
3. Southern gas-fired thermal power plant
(location depends on gas source) 1,200 MW 2007-2010
4. Thai Binh gas-fired thermal power plant - The capacity
shall depend on the gas source’s capacity 2007-2008
c/ Electricity exchange with Laos and Cambodia:
The capacity and time of exchange shall depend on the negotiation process.
d/ Geothermal and wind power: The study of these forms of energy shall depend on the potentials of localities.
III. ORIENTATIONS FOR POWER SOURCES TO OPERATE IN THE 2011-2020 PERIOD
a/ On hydroelectricity:
- To supplement the planning on hydroelectric power system on the main rivers, to proceed with the elaboration of pre-feasibility and feasibility study reports for projects with high efficiency so as to submit them for ratification according to current regulations.
- To actively make all-round preparations for the building of Son La hydroelectric power plant according to the prescribed contents; the construction scope and time shall be decided by the Prime Minister upon approval of the project’s feasibility study report.
- To study a number of hydroelectric power storage projects for future use.
b/ On thermoelectric power sources:
To prepare investment in projects based on the capacity of fuel sources (gas, coal, oil...) so as to define locations in Cuu Long river delta, northern provinces and coastal region for submission and approval.
c/ On nuclear power:
The Ministry of Industry shall assume the prime responsibility and coordinate with the Ministry of Science, Technology and Environment in finalizing an overall report on the development of nuclear power in Vietnam, to be submitted to the Prime Minister for consideration in 2001-2002.
APPENDIX II
PROGRAM ON POWER GRID DEVELOPMENT IN THE 2001-2010 PERIOD, WITH THE PROSPECT TOWARD 2020 TAKEN INTO ACCOUNT
(Issued together with the Prime Minister’s Decision No. 95/2001/QD-TTg of June 22, 2001)
I.1. 500 KV POWER LINES
No. | Names of projects | Number of circuits x km | Operation years | |||
1. The 2001-2005 period | 1. The 2001-2005 period | 1. The 2001-2005 period | 1. The 2001-2005 period | |||
1 | Pleicu - Phu Lam (circuit 2) | 1 x 547 | 2002 | |||
2 | Pleicu - Dung Quat - Da Nang | 1 x 280 | 2003 - 2004 | |||
3 | Phu My - Nha Be | 2 x 49 | 2002 | |||
4 | Nha Be - Phu Lam | 1 x 16 | 2002 | |||
5 | Nha Be - O Mon | 1 x 180 | 2004 - 2005 | |||
6 | Ca Mau - O Mon | 2 x 150 | 2005 | |||
2. Expectation for the 2006 - 2010 period | 2. Expectation for the 2006 - 2010 period | 2. Expectation for the 2006 - 2010 period | 2. Expectation for the 2006 - 2010 period | |||
1 | Nho Quan - Thuong Tin | 1 x 75 | 2006 - 2010 | |||
2 | Feeder to Nho Quan station of 500 KV | 2 x 30 | 2006 - 2010 | |||
3 | Phu Lam - O Mon | 1 x 170 | 2006 - 2010 | |||
4 | Ha Tinh - Nho Quan | 1 x 260 | 2006 - 2010 | |||
5 | Ha Tinh - Da Nang | 1 x 390 | 2006 - 2010 | |||
6 | Feeder to Dong Nai 3 & 4 | 2 x 20 | 2006 - 2010 | |||
3. Orientation for the 2011 - 2020 period | 3. Orientation for the 2011 - 2020 period | 3. Orientation for the 2011 - 2020 period | 3. Orientation for the 2011 - 2020 period | |||
1 | Hoa Binh - Son La | 1 x 180 | 2011 - 2020 | |||
2 | Son La - Nho Quan | 1 x 240 | " | |||
3 | Son La - Soc Son | 2 x 200 | " | |||
4 | Soc Son - Trang Bach | 1 x 95 | " | |||
5 | Trang Bach - Thuong Tin | 1 x 110 | " | |||
6 | Feeder to Quang Tri - Quang Tri | 2 x 5 | " | |||
7 | Phu My - Bien Hoa | 1 x 40 | " | |||
8 | Bien Hoa - Tan Dinh | 1 x 30 | " | |||
9 | Feeder to Hoc Mon - Hoc Mon | 2 x 10 | " | |||
10 | Bien Hoa - Thu Duc | 2 x 20 | " | |||
11 | Nuclear power - Phu My | 1 x 160 | " | |||
12 | Nha Trang - Nuclear power - Di Linh | 1 x 160 | " | |||
13 | Nuclear power - Bien Hoa | 2 x 170 | " |
I.2. 500 KV TRANSFORMER STATIONS
No. | Names of projects | Number of transformers x MVA | Capacity - MVA | Operation years | |||||||||||||||||||
1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | |||||||||||||||||||
1 | Ha Tinh | 1 x 450 | 450 | 2002 | |||||||||||||||||||
2 | Da Nang | 1 x 450 | 450 | 2004 | |||||||||||||||||||
3 | Di Linh | 1 x 450 | 450 | 2005 | |||||||||||||||||||
4 | O Mon | 1 x 450 | 450 | 2005 | |||||||||||||||||||
5 | Tan Dinh | 1 x 450 | 450 | 2004 - 2005 | |||||||||||||||||||
6 | Nha Be | 2 x 600 | 1,200 | 2002 | |||||||||||||||||||
7 | Phu My | 1 x 450 | 450 | 2002 | |||||||||||||||||||
2. Expectation for the 2006 - 2010 period | 2. Expectation for the 2006 - 2010 period | 2. Expectation for the 2006 - 2010 period | 2. Expectation for the 2006 - 2010 period | 2. Expectation for the 2006 - 2010 period | |||||||||||||||||||
1 | Nho Quan | 1 x 450 | 450 | 2006 - 2010 | |||||||||||||||||||
2 | Thuong Tin | 1 x 450 | 450 | 2006 - 2010 (Transformer 2) | |||||||||||||||||||
3 | Tan Dinh | 1 x 450 | 450 | 2006 - 2010 | |||||||||||||||||||
4 | Ca Mau | 1 x 450 | 450 | 2006 - 2010 | |||||||||||||||||||
5 | Dung Quat | 1 x 450 | 450 | 2006 - 2010 | |||||||||||||||||||
3. Orientation for the 2011 -2020 period | 3. Orientation for the 2011 -2020 period | 3. Orientation for the 2011 -2020 period | 3. Orientation for the 2011 -2020 period | 3. Orientation for the 2011 -2020 period | |||||||||||||||||||
1 | Son La | 1 x 450 | 450 | 2011 - 2020 | |||||||||||||||||||
2 | Soc Son | 2 x 1000 | 2,000 | " | |||||||||||||||||||
3 | Trang Bach | 1 x 450 | 450 | " | |||||||||||||||||||
4 | Viet Tri | 2 x 450 | 900 | " | |||||||||||||||||||
5 | Hoc Mon | 2 x 750 | 1,500 | " | |||||||||||||||||||
6 | Bien Hoa | 2 x 450 | 900 | " | |||||||||||||||||||
7 | Nha Trang | 1 x 450 | 450 | " | |||||||||||||||||||
8 | Thanh Hoa | 1 x 450 | 450 | " | |||||||||||||||||||
9 | Thu Duc | 2 x 600 | 1,200 | " | |||||||||||||||||||
1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | 1. The 2001 - 2005 period | ||||||||||||||||
No. | Names of projects | Number of transformers x MVA | Number of transformers x MVA | Number of transformers x MVA | Capacity (MVA) | Operation years | Operation years | ||||||||||||||||
Northern provinces | Northern provinces | Northern provinces | Northern provinces | Northern provinces | Northern provinces | Northern provinces | Northern provinces | ||||||||||||||||
1 | Mai Dong | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2001 - 2002 | Replacement of transformers | ||||||||||||||||
2 | Soc Son | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2001 - 2005 |
| ||||||||||||||||
3 | Bac Giang | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2001 |
| ||||||||||||||||
4 | Pho Noi | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2001 - 2005 |
| ||||||||||||||||
5 | Trang Bach | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2001 |
| ||||||||||||||||
6 | Quang Ninh | 1 x 125 | 1 x 125 | 1 x 125 | 250 | 2001- 2005 |
| ||||||||||||||||
7 | Vat Cach | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2001 |
| ||||||||||||||||
8 | Viet Tri | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2001 - 2005 |
| ||||||||||||||||
9 | Ha Tinh | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 |
| ||||||||||||||||
10 | Thai Binh | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 |
| ||||||||||||||||
11 | Dinh Vu | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2004 - 2005 |
| ||||||||||||||||
12 | Bac Ninh | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2004 - 2005 |
| ||||||||||||||||
13 | Xuan Mai | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 |
| ||||||||||||||||
14 | Nam Dinh | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 - 2003 | Second transformer | ||||||||||||||||
15 | Uong Bi | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2004 - 2005 |
| ||||||||||||||||
16 | Yen Bai | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2004 - 2005 |
| ||||||||||||||||
17 | Nghi Son | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 |
| ||||||||||||||||
18 | Thai Nguyen | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 - 2005 | Second transformer | ||||||||||||||||
Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | ||||||||||||||||
1 | Hoa Khanh | Hoa Khanh | 2 x 125 | 250 | 250 | 2001 - 2005 |
| ||||||||||||||||
2 | Hue | Hue | 1 x 125 | 125 | 125 | 2001 |
| ||||||||||||||||
3 | Dung Quat | Dung Quat | 2 x 63 | 126 | 126 | 2001 - 2005 |
| ||||||||||||||||
4 | Quy Nhon | Quy Nhon | 1 x 125 | 125 | 125 | 2002 - 2003 | Second transformer | ||||||||||||||||
5 | Krong Buk | Krong Buk | 1 x 125 | 125 | 125 | 2002 | " | ||||||||||||||||
6 | Nha Trang | Nha Trang | 1 x 125 | 125 | 125 | 2003 | " | ||||||||||||||||
Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | ||||||||||||||||
1 | Long Binh | 1 x 125 | 1 x 125 | 1 x 125 | 250 | 2001 | Replacement of transformers | ||||||||||||||||
2 | Long Thanh | 2 x 125 | 2 x 125 | 2 x 125 | 500 | 2001 - 2005 |
| ||||||||||||||||
3 | Binh Chuan (Bien Hoa) | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2001 - 2005 |
| ||||||||||||||||
4 | Bao Loc | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2001 |
| ||||||||||||||||
5 | Phu Lam | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2001 - 2002 | Replacement of transformers | ||||||||||||||||
6 | Thu Duc | 2 x 175 | 2 x 175 | 2 x 175 | 350 | 2002 |
| ||||||||||||||||
7 | Tao Dan | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2002 - 2005 |
| ||||||||||||||||
8 | Cat Lai | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2002 - 2003 |
| ||||||||||||||||
9 | South of Sai Gon | 1 x 250 | 1 x 250 | 1 x 250 | 250 | 2004 - 2005 |
| ||||||||||||||||
10 | Ba Ria | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 - 2003 |
| ||||||||||||||||
11 | Vung Tau | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 - 2003 |
| ||||||||||||||||
12 | Tan Dinh | 1 x 250 | 1 x 250 | 1 x 250 | 250 | 2004 - 2005 |
| ||||||||||||||||
13 | Dai Ninh | 1 x 63 | 1 x 63 | 1 x 63 | 63 | 2005 |
| ||||||||||||||||
14 | Vinh Long | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2002 - 2003 |
| ||||||||||||||||
15 | Thot Not | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2002 - 2003 |
| ||||||||||||||||
16 | Kien Luong | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 - 2003 |
| ||||||||||||||||
17 | My Tho | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2003 - 2004 |
| ||||||||||||||||
18 | Ham Thuan | 1 x 63 | 1 x 63 | 1 x 63 | 63 | 2001 |
| ||||||||||||||||
19 | Bac Lieu | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2002 |
| ||||||||||||||||
20 | Chau Doc | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2003-2004 |
| ||||||||||||||||
21 | Tan Rai | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2005 | Aluminum treatment | ||||||||||||||||
22 | Tri An | 1 x 63 | 1 x 63 | 1 x 63 | 63 | 2004 - 2005 | Second transformer | ||||||||||||||||
2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | ||||||||||||||||
1 | Yen Phu | 1 x 250 | 1 x 250 | 1 x 250 | 250 | 2006 - 2010 | Second transformer | ||||||||||||||||
2 | Trang Bach | 1 x 125 | 1 x 125 | 1 x 125 | 125 | " | Second transformer | ||||||||||||||||
3 | Bac Giang | 1 x 125 | 1 x 125 | 1 x 125 | 125 | " | Second transformer | ||||||||||||||||
4 | Thai Binh | 1 x 125 | 1 x 125 | 1 x 125 | 125 | " |
| ||||||||||||||||
5 | Van Tri | 1 x 250 | 1 x 250 | 1 x 250 | 250 | " |
| ||||||||||||||||
6 | Hai Duong | 1 x 125 | 1 x 125 | 1 x 125 | 125 | " |
| ||||||||||||||||
7 | Dinh Vu | 1 x 125 | 1 x 125 | 1 x 125 | 125 | " | Second transformer | ||||||||||||||||
8 | Vat Cach | 1 x 125 | 1 x 125 | 1 x 125 | 125 | " | Second transformer | ||||||||||||||||
9 | Hai Phong thermoelectricpower plant | 2 x 125 | 2 x 125 | 2 x 125 | 250 | �� |
| ||||||||||||||||
10 | Dong Hoa | 2 x 250 | 2 x 250 | 2 x 250 | 500 | " | Replacement of transformers | ||||||||||||||||
11 | Quang Ninh thermoelectric power plant | 2 x 125 | 2 x 125 | 2 x 125 | 250 | �� |
| ||||||||||||||||
12 | Son Tay | 1 x 125 | 1 x 125 | 1 x 125 | 125 | �� |
| ||||||||||||||||
13 | Xuan Mai | 1 x 125 | 1 x 125 | 1 x 125 | 125 | " | Second transformer | ||||||||||||||||
14 | Phu Ly | 1 x 125 | 1 x 125 | 1 x 125 | 125 | �� |
| ||||||||||||||||
15 | Nghi Son | 1 x 125 | 1 x 125 | 1 x 125 | 125 | �� | Second transformer | ||||||||||||||||
Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | ||||||||||||||||
1 | Hue | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 | Second transformer | ||||||||||||||||
2 | Tam Ky | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
3 | Dung Quat industrial park | 1 x 250 | 1 x 250 | 1 x 250 | 250 | 2006 - 2010 |
| ||||||||||||||||
4 | Tuy Hoa | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
5 | Krong Buk | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 | Replacement of transformers | ||||||||||||||||
Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | ||||||||||||||||
1 | South of Sai Gon | 1 x 125 | 1 x 125 | 1 x 125 | 250 | 2006 - 2010 | Second transformer | ||||||||||||||||
2 | Hoa Xa | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2006 - 2010 |
| ||||||||||||||||
3 | Tan Binh | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2006 - 2010 |
| ||||||||||||||||
4 | Song May | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
5 | Nhon Trach | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
6 | Vung Tau | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 | Second transformer | ||||||||||||||||
7 | My Tho | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 | Second transformer | ||||||||||||||||
8 | Long An | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2006 - 2010 |
| ||||||||||||||||
9 | Ben Tre | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
10 | Cao Lanh | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
11 | Kien Luong | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 | Second transformer | ||||||||||||||||
12 | Ca Mau | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
13 | Soc Trang | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
14 | Phan Thiet | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 |
| ||||||||||||||||
15 | Trang Bang | 1 x 250 | 1 x 250 | 1 x 250 | 250 | 2006 - 2010 |
| ||||||||||||||||
16 | Chau Doc | 1 x 125 | 1 x 125 | 1 x 125 | 125 | 2006 - 2010 | Second transformer | ||||||||||||||||
3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | ||||||||||||||||
1 | Dong Anh | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
2 | Dong Trieu | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
3 | Do Son | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
4 | Bim Son | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
5 | Cai Lan | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
6 | Cua Ong | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
7 | Hung Yen | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
8 | Hoa Lac | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
9 | Lao Cai | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
10 | Lang Son | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
11 | Luu Xa | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
12 | Phu Tho | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
13 | Quynh Luu | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
14 | Son La | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
15 | Son Tay | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
16 | Sai Dong | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
17 | Thach Khe | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
18 | Trinh Xuyen | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
19 | Trang Bach | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
20 | Tuyen Quang | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
21 | Vinh Phuc | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
22 | Vung Ang | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | ||||||||||||||||
1 | Cam Ranh | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
2 | Dong Ha | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
3 | Ba Don | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
4 | Dung Quat industrial park | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
5 | Doc Soi | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
6 | Kon Tum | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
7 | Quang Nam | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | ||||||||||||||||
1 | Da Lat | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
2 | Duc Trong | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
3 | An Phuoc | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
4 | An Phuoc | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
5 | Binh Chanh | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
6 | Binh Long | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
7 | Binh Phuoc | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
8 | Song Be industrial park | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
9 | Long Xuyen | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
10 | Nhon Trach | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
11 | Sa Dec | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
12 | Soc Trang | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
13 | Song May | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
14 | Tan Dinh | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
15 | Tan Binh | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
16 | Tay Ninh | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
17 | Tam Phuoc | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
18 | Thap Cham | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
19 | Thu Duc Bac | 2 x 250 | 2 x 250 | 2 x 250 | 500 | 2011- 2020 |
| ||||||||||||||||
20 | Tra Vinh | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
21 | Xuan Loc | 2 x 125 | 2 x 125 | 2 x 125 | 250 | 2011- 2020 |
| ||||||||||||||||
|
|
|
|
|
|
|
| ||||||||||||||||
|
|
|
|
|
|
|
|
II. PROJECTS ON 220 KV POWER GRIDS
II. 1. 220 KV TRANSFORMER STATIONS
II.2. 220 KV POWER LINES
No. | Names of projects | Number of circuits x km | Operation years | Notes | ||||
1. Projects to be operating and completed in the years of 2001 to 2005 Northern provinces | 1. Projects to be operating and completed in the years of 2001 to 2005 Northern provinces | 1. Projects to be operating and completed in the years of 2001 to 2005 Northern provinces | 1. Projects to be operating and completed in the years of 2001 to 2005 Northern provinces | 1. Projects to be operating and completed in the years of 2001 to 2005 Northern provinces | ||||
1 | Nam Dinh - Thai Binh | 1 x 30 | 2002 | 2-circuit poles | ||||
2 | Thai Binh - Hai Phong | 1 x 45 | 2002 | " | ||||
3 | Bac Giang - Thai Nguyen | 1 x 55 | 2003 - 2004 |
| ||||
4 | Viet Tri - Son La | 1 x 160 | 2003 - 2004 | Temporary operation of 110 kV power lines | ||||
5 | Dong Hoa - Dinh Vu | 2 x 17 | 2004 - 2005 |
| ||||
6 | Viet Tri - Yen Bai | 1 x 75 | 2004 - 2005 |
| ||||
7 | Feeder to Ha Tinh station | 2 x 7 | 2002 |
| ||||
8 | Uong Bi - Trang Bach | 2 x 19 | 2004 - 2005 |
| ||||
Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | ||||
1 | Hoa Khanh - Hue | 2 x 80 | 2001 |
| ||||
2 | Da Nhim - Nha Trang | 1 x 140 | 2003 - 2004 |
| ||||
Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | ||||
1 | Phu My - Cat Lai | 2 x 35 | 2001 | Cables + DZK | ||||
2 | Cat Lai - Thu Duc | 2 x 10 | 2002 | Cables + DZK | ||||
3 | Nha Be - Tao Dan | 2 x 10 | 2002 - 2003 |
| ||||
4 | Ba Ria - Vung Tau | 2 x 15 | 2002 - 2003 |
| ||||
5 | Dai Ninh - Di Linh | 2 x 39 | 2005 |
| ||||
6 | Rach Gia - Bac Lieu | 1 x 105 | 2002 |
| ||||
7 | Tan Dinh - Binh Chuan | 2 x 18 | 2002 - 2004 |
| ||||
8 | Nha Be � South of Sai Gon | 2 x 7 | 2004 - 2005 |
| ||||
9 | Thu Duc - Hoc Mon | 1 x 16 | 2002 - 2003 | Circuit 2 | ||||
10 | Long Binh - Thu Duc | 1 x 16 | 2002 - 2003 | " | ||||
11 | My Tho - Ben Tre | 1 x 25 | 2002 | Temporary operation of 110 kV power lines | ||||
12 | Thot Not-Chau Doc-Tinh Bien | 1 x 96 | 2003 |
| ||||
13 | Joint to O Mon power plant | 2 x 15 | 2004 |
| ||||
14 | O Mon - Thot Not | 2 x 28 | 2004 |
| ||||
15 | Bao Loc - Tan Rai | 2 x 20 | 2005 | Designed to be made of aluminum | ||||
2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | 2. Projects designed for the 2006 - 2010 period Northern provinces | ||||
1 | Dai Thi - Yen Bai | 2 x 160 | 2006 - 2010 |
| ||||
2 | Feeder to Nho Quan station | 2 x 5 | " |
| ||||
3 | Hai Phong thermoelectric power plant- Dinh Vu | 2 x 17 | " |
| ||||
4 | Hai Phong thermoelectric power plant - Vat Cach | 2 x 19 | " |
| ||||
5 | Feeder to Hai Duong - Hai Duong | 2 x 15 | " |
| ||||
6 | Ha Tinh - Thach Khe | 2 x 9 | " |
| ||||
7 | Van Tri - Soc Son | 2 x 25 | " |
| ||||
8 | Van Tri - Chem | 2 x 10 | " |
| ||||
9 | Mai Dong - Yen Phu | 2 x 8 | " | Circuit 2 | ||||
10 | Vinh - Ha Tinh | 1 x 50 | " |
| ||||
11 | Ban La - Vinh | 2 x 110 | " |
| ||||
12 | Lang Bang thermoelectric power plant - Hoanh Bo | 2 x 15 | " |
| ||||
13 | Lang Bang thermoelectric power plant - Cam Pha thermoelectric power plant | 2 x 30 | " |
| ||||
14 | Thai Binh thermoelectric power plant - Thai Binh | 2 x 20 | " |
| ||||
Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | ||||
1 | Dung Quat - Dung Quat steel | 2 x 9 | 2006 - 2010 |
| ||||
2 | Ha Song Ba - Tuy Hoa | 2 x 40 | " |
| ||||
3 | Quy Nhon - Tuy Hoa | 1 x 95 | " |
| ||||
4 | Tuy Hoa - Nha Trang | 1 x 110 | " |
| ||||
5 | Dong Hoi - Hue | 1 x 165 | " |
| ||||
6 | Pleikrong - Pleicu | 1 x 50 | " |
| ||||
7 | A Vuong - Da Nang | 1 x 80 | " |
| ||||
8 | Buon Kuop - Krong Buk | 2 x 40 | " |
| ||||
9 | Tranh river 2- Dung Quat | 2 x 75 | " |
| ||||
10 | SeSan 3 - Pleicu | 2 x 35 | " |
| ||||
Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | ||||
1 | Hoc Mon - Hoa Xa | 2 x 10 | 2006 - 2010 |
| ||||
2 | Tra Noc - Soc Trang | 2 x 75 | " |
| ||||
3 | Bac Lieu - Soc Trang | 1 x 53 | " |
| ||||
4 | Bac Lieu - Ca Mau | 1 x 70 | " |
| ||||
5 | Da Nhim - Da Lat | 1 x 50 | " |
| ||||
6 | Kien Luong - Chau Doc | 1 x 75 | " |
| ||||
7 | Trang Bang - Tan Dinh | 2 x 35 | " |
| ||||
3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | 3. Projects designed for the 2011 - 2020 period Northern provinces | ||||
1 | Thanh Hoa - Vinh | 1 x 161 | 2011 - 2020 | Circuit 2 | ||||
2 | Hoa Binh - Son Tay | 1 x 50 | " |
| ||||
3 | Quang Ninh thermoelectric power plant - Mong Duong | 2 x 45 | " |
| ||||
4 | Bac Giang - Pha Lai | 1 x 25 | " | Circuit 2 | ||||
5 | Yen Bai - Son La | 1 x 140 | " |
| ||||
6 | Son La - Son La provincial capital | 1 x 20 | " |
| ||||
7 | Nam Dinh - Ninh Binh | 1 x 28 | " | Circuit 2 | ||||
8 | Pho Noi - Sai Dong | 2 x 20 | " |
| ||||
9 | Pho Noi - Hung Yen | 1 x 25 | " |
| ||||
10 | Hoanh Bo - Cai Lan | 2 x 12 | " |
| ||||
11 | Thanh Hoa - Ba Che | 2 x 15 | " |
| ||||
12 | Tuyen Quang - Thai Nguyen | 1 x 70 | " |
| ||||
13 | Dong Anh - Sai Dong | 2 x 20 | " |
| ||||
14 | Da Phuc - Dong Anh | 2 x 20 | " |
| ||||
15 | Hung Yen - Long Boi | 1 x 35 | " |
| ||||
16 | Yen Bai - Lao Cai | 1 x 110 | " |
| ||||
17 | Son La - Huoi Quang | 2 x 20 | " |
| ||||
18 | Thai Nguyen - Luu Xa | 1 x 11 | " |
| ||||
19 | Thai Nguyen - Bac Kan | 1 x 70 | " |
| ||||
20 | Bac Giang - Lang Son | 1 x 60 | " |
| ||||
21 | Son La provincial capital - Tuan Giao | 1 x 55 | " |
| ||||
22 | Bac Me - Dai Thi | 2 x 60 | " |
| ||||
23 | Ha Tinh -Vung Ang | 1 x 40 | " |
| ||||
Central provinces | Central provinces | Central provinces | Central provinces | Central provinces | ||||
1 | Da Nang - District 3 | 2 x 8 | " |
| ||||
2 | SeSan 4 - Pleicu | 2 x 43 | " |
| ||||
3 | Serepok - Krong Buk | 2 x 80 | " |
| ||||
Southern provinces | Southern provinces | Southern provinces | Southern provinces | Southern provinces | ||||
1 | Tra Noc - Vinh Long | 1 x 35 | 2011 - 2020 | Circuit 2 | ||||
2 | Ham Thuan - Phan Thiet | 1 x 60 | " |
| ||||
3 | Long Xuyen - Thot Not | 1 x 15 | " |
| ||||
4 | Long Binh - Tam Phuoc | 2 x 6 | " |
| ||||
5 | Feeder to Cao Lanh - Cao Lanh | 2 x 15 | " |
| ||||
6 | Vinh Long - Tra Vinh | 1 x 65 | " |
| ||||
7 | Tan Dinh - Tay Ninh | 2 x 72 | " |
| ||||
8 | Tan Dinh - Tan Dinh industrial park | 2 x 8 | " |
| ||||
9 | Cai Lay - O Mon | 1 x 90 | " | Circuit 2 | ||||
10 | Cai Lay - Thot Not | 1 x 80 | " | Circuit 2 | ||||
11 | My Tho - Ben Tre | 1 x 25 | " |
| ||||
12 | Bac Lieu - Ca Mau | 2 x 65 | " |
| ||||
13 | Xuan Loc - Long Binh | 1 x 40 | " |
| ||||
14 | Long Thanh - An Phuoc | 2 x 8 | " |
| ||||
15 | Nhon Trach - Long Binh | 2 x 15 | " |
| ||||
16 | Nhon Trach - Cat Lai | 2 x 10 | " |
| ||||
17 | Nha Trang - Cam Ranh | 1 x 35 | " |
| ||||
18 | Tay Ninh - Binh Long | 2 x 75 | " |
| ||||
19 | Dong Nai 6 - Di Linh | 2 x 30 | " |
|
File gốc của Decision No. 95/2001/QD-TTg, ratifying the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account, promulgated by the Prime Minister of Government. đang được cập nhật.
Decision No. 95/2001/QD-TTg, ratifying the planning on Vietnam electricity development in the 2001-2010 period, with the prospect toward 2020 taken into account, promulgated by the Prime Minister of Government.
Tóm tắt
Cơ quan ban hành | Thủ tướng Chính phủ |
Số hiệu | 95/2001/QD-TTg |
Loại văn bản | Quyết định |
Người ký | Phan Văn Khải |
Ngày ban hành | 2001-06-22 |
Ngày hiệu lực | 2001-07-07 |
Lĩnh vực | Xây dựng - Đô thị |
Tình trạng | Đã hủy |