Skip to content
  • Giới thiệu
  • Bảng giá
  • Hướng dẫn sử dụng
  • English
Dữ Liệu Pháp LuậtDữ Liệu Pháp Luật
    • Văn bản mới
    • Chính sách mới
    • Tin văn bản
    • Kiến thức luật
    • Biểu mẫu
  • -
Trang chủ » Văn bản pháp luật » Điện lực » Thông tư 31/2022/TT-BCT
  • Nội dung
  • Bản gốc
  • VB liên quan
  • Tải xuống

MINISTRY OF INDUSTRY AND TRADE OF VIETNAM
------

SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
----------------

No. 31/2022/TT-BCT

Hanoi, November 8, 2022

 

CIRCULAR

 AMENDMENTS TO CIRCULAR NO. 57/2014/TT-BCT DATED DECEMBER 19, 2014 OF THE MINISTER OF INDUSTRY AND TRADE ON METHODS AND PROCEDURES FOR DEVELOPING, PROMULGATING ELECTRICITY GENERATION PRICE RANGE AND CIRCULAR NO. 57/2020/TT-BCT DATED DECEMBER 31, 2020 OF THE MINISTER OF INDUSTRY AND TRADE ON METHODS FOR DETERMINING ELECTRICITY GENERATION PRICE AND POWER PURCHASE AGREEMENT PRICE

Pursuant to Decree No. the Government's Decree No. 98/2017/ND-CP dated August 18, 2017 on functions, tasks, entitlements and organizational structure of the Ministry of Industry and Trade;

Pursuant to the Law on Electricity date December 3, 2004; the Law on amendments to the Law on Electricity dated November 20, 2012; and the Law on amendments to the Law on Electricity dated January 11, 2022;

Pursuant to Decree No. 137/2013/ND-CP dated October 21, 2013 of the Government elaborating the Law on Electricity and the Law on amendments to the Law on Electricity;

At request of the Director of Electricity Regulatory Authority of Vietnam;

The Minister of Industry and Trade promulgates Circular on amendments to Circular No. 57/2014/TT-BCT dated December 19, 2014 of the Minister of Industry and Trade on methods and procedures for developing, promulgating electricity generation price range and Circular No. 57/2020/TT-BCT dated December 31, 2020 of the Minister of Industry and Trade on methods for determining electricity generation price and power purchase agreement price.

Article 1. Amendment to Circular No. 57/2014/TT-BCT dated December 19, 2014 of the Minister of Industry and Trade on methods and procedures for developing, promulgating electricity generation price range

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



“2. “a standard power plant” refers to a thermo-electric plant with capacity of popular assemblies determined in the national electricity development planning that represents a type of thermo-electric plant with the same electricity generation technology, used fuel and is used to calculate electricity generation price range for such power plant.”

2. Amend Clause 4 Article 2 as follows:

“4. “total investment” refers to total investment of the project determined in accordance with applicable regulations and law, fundamental design, and other contents of feasibility study of construction project.”

3. Amend Clause 2 Article 3 as follows:

“2. For thermo-electricity plant: ceiling costs mean electricity generation price of the standard power plant with the methods for determining electricity generation price of standard power plant are specified under Articles 5 through 8 hereof.”

4. Amend Clause 3 Article 6 as follows:

“3. Investment rate means the investment in 1 kW of average capacity of the standard power plant (excluding costs for port, infrastructures, storage, regasification, and transport of LNG from port warehouse to power plant) and is calculated using data in the approved feasibility study of construction project, and total investment effective at the time of calculating electricity generation price range or data negotiated under power purchase agreement (if any), and is updated based on foreign exchange rate at the time of calculation.”

5. Amend Point a Clause 4 Article 6 as follows:

“a) Loan interest rate rd (%) is calculated using weighted average interest rate of loans in VND and foreign currency according to the following formula:

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



In which:

DF: Percentage of loans in foreign currency in total loans as specified under Appendix I hereof (%);

DD: Percentage of loans in VND in total loans as specified under Appendix I hereof (%);

rd,R: Interest of loans in foreign currency determined on the basis of interest of loans in foreign currency of power plant projects where negotiation on electricity price has been carried out within 5 years prior to the date of calculating electricity generation price range (%/year);

rd,D: Interest of loans in VND determined on the basis of interest of loans in VND of power plant projects where negotiation on electricity price has been carried out within 5 years prior to the date of calculating electricity generation price range (%/year).”

6. Amend Clause 5 Article 6 as follows:

“Annual average electricity at the point of delivery Abq (kWh) of the Standard Power Plant is determined using the following formula:

Abq = Pt x Tmax x (1 - kCS)

In which:

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



Tmax: Number of operation hours at maximum capacity (hour);

kCS: Average power attenuation rate of the entire economic life of the power plant based on technical dossiers of manufacturers. The case where average power attenuation cannot be identified, average power attenuation rates of power plants with similar technology and install capacity (%) shall prevail.”

7. Amend Article 8 as follows:

“Article 8. Methods for determining variable cost of Standard Power Plant for the year of application of the price range

Variable cost of Standard Power Plant for the year of application of the price range (VC) is the component to recover costs of fuel and other variable costs calculated with the following formula:

VC = HR x Pnlc x (1 + f)

In which:

VC: Variable costs of Standard Power Plant (VND/kWh);

HR: Net heat rate calculated under load specified under Appendix I attached hereto, expressed as kcal/kWh, kJ/kWh or BTU/kWh;

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



Pnlc: Costs of primary fuel of Standard Power Plant (VAT not included), expressed in VND/kcal, VND/kJ, or VND/BTU, and determined as follows:

- In case of a coal-fired thermal power plant, coal price already covers depreciation, operation, management, and insurance costs (if any) but does not cover transport rate. If transport rate cannot be identified in accordance with fuel supply agreement, costs of primary fuel shall be determined using fuel costs under fuel sale agreement for the primary fuel;

- In case of gas turbine combined cycle power plant using natural gas, primary fuel costs refer to gas cost at the wells without including costs for transporting the gas to power plants;

- In case of gas turbine combined cycle power plant using LNG, primary fuel costs include LNG import costs, LNG import duties (if any), costs for transporting LNG to regasification ports and do not include costs for storage, regasification, and distribution after regasification (if any).

If power plants have not entered into fuel supply agreements, data under agreements between project developers and fuel suppliers or data calculated by counseling organizations shall prevail.

8. Amend Article 10 as follows:

“Article 10. Procedures for developing and promulgating electricity generation price range

1. Within 15 working days from the date on which Feasibility study for construction investment of power plants is approved. Project developers of these power plants are responsible for providing Feasibility study for construction investment for Vietnam Electricity (EVN).

2. Before November 1 of each year, the EVN is responsible for:

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



b) Propose Standard Power Plant and parameters involved in the calculation of electricity generation price for Standard Power Plant under Appendix I hereof depending on implementation of power purchase agreements and produce documents on calculation of electricity generation price range in accordance with Article 11 hereof and request Electricity Regulatory Authority of Vietnam (ERAV) to appraise:

c) Calculate ceiling costs of hydroelectricity plants using methods under Article 9 hereof.

3. Within 5 working days from the date on which documents on calculation of electricity generation price range under Point b Clause 2 of this Article are received, the ERAV is responsible for inspecting legitimacy of the documents. If necessary, the ERAV shall request the EVN to amend or clarify contents of the documents. Within 15 working days from the date on which the request for revision is received, the EVN is responsible for submitting reports explaining contents of the documents as requested.

4. Within 20 working days from the date on which legitimate documents and reports clarifying contents of the documents sent by the EVN are received, the ERAV is responsible for choosing Standard Power Plants and organize appraisal of electricity generation price range proposed by the EVN.

5. Within 15 working days from the date on which electricity generation price range is appraised, ERAV is responsible for completing documents and requesting the Minister of Industry and Trade to approve electricity generation price range for the following year and publishing on website of the ERAV. The case where electricity generation price range of the following year has not been announced, the latest valid electricity generation price range shall prevail.”

9. Amend Clause 1 Article 11 as follows:

“1. Presentation of the EVN pertaining to selection of parameters of Standard Power Plants and calculation of electricity generation price range of power plants under Point b and Point c Clause 2 Article 10 hereof.”

10. Amend net heat rate and primary fuel costs under Appendix 2 as follows:

1

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



HR

kcal/kWh or kJ/kWh or BTU/kWh

2

Primary fuel costs

Pnlc

VND/kcal or VND/kJ or VND/BTU

Article 2. Amend Circular No. 57/2020/TT-BTC dated December 31, 2020 of the Minister of Industry and Trade on methods of determining electricity generation prices and power purchase agreement value

1. Amend Clause 4 Article 3 as follows:

“4. Power purchase agreement price for comparing with electricity generation price range in the base year

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



In case the base year of a thermal power plant lacks electricity generation price range, PPA price of the thermal power plant shall be calculated on the basis of corresponding cost components in order to compare with electricity generation price range of the latest year applied to the power plant:

b) In case projects have commenced without entering into PPA before the effective date hereof:

PPA price must vary within electricity price range in the PPA negotiation year, in which PPA price of thermal power plants for the purpose of comparing with electricity generation price range shall be calculated on the basis of cost components corresponding to cost components serving calculation of electricity generation price range.”

2. Amend Clause 3 Article 7 as follows:

“3. Variable cost adjusted by other factors of power plants in the base year is determined using the following formula:

VCkb =

Cvlp + Ckđ + Ck

(VND/kWh)

AGN

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



Cvlp: Total annual auxiliary material cost of power plants determined based on quantity and unit price of auxiliary materials used for electricity generation in the base year (VND); If data required for the calculation of total annual auxiliary material costs in the base year is insufficient, the costs components can be calculated using data from a year with sufficient data and converted to the base year at a rate of 2,5%/year;

Ckd: Total initiation costs include fuel costs, other costs serving initiation (VND); number of initiation sessions agreed upon by both parties on the basis of electrical grid demand and operational characteristics of power plants; If data required for the calculation of total initiation costs in the base year is insufficient, these costs can be calculated using data from a year with sufficient data and converted to the base year at a rate of 2,5%/year;

Ck: Annual regular repair and maintenance costs including regular repair and maintenance costs calculated on the basis of total construction and equipment investment of power plants, percentage of regular repair and maintenance costs agreed upon by both parties without exceeding value under Annex 1 hereof and costs for dredging port entry agreed upon by both parties (if any) (VND). If data required for the calculation of navigation channel dredging costs in the base year is insufficient, these costs can be calculated using data from a year with sufficient data and converted to the base year at a rate of 2,5%/year;

AGN: Average electricity generated over multiple years at delivery points between the Buyer and the Seller and calculated according to Clause 1 Article 6 hereof (kWh).

3. Add Clause 5 Article 12 as follows:

 “5. The base year of power plants negotiating electricity price under finalized investment capital shall be the year in which the investment capital is finalized.”

4. Amend Clause 2 Article 13 as follows:

“2. On the basis of practical loan capacity and financial capacity of projects, both parties shall negotiate about average fixed price of power plants and convert to annual fixed cost (FCj: fixed cost of year j) as long as average fixed cost does not change compared to mutually agreed value and following principles are complied:

a) Financial discount rate when calculating annual fixed price agreed by both parties using the IRR of power plants;

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



5. Amend Point c Clause 3 Article 15 as follows:

“c) Components of variable costs adjusted according to other variations of power plants in the year j VCkj is determined using the following formula:

VCkj = VCkb x (1 + (l - 1) x kHS) x (1 + i)m-1

In which:

VCkb: Components of variable costs adjusted according to other variations of power plants in the base year determined under Clause 3 Article 7 hereof;

i: Inflation rates of components of variable prices adjusted according to other variations based on rates under Appendix I hereof.

kHS: Percentage of capacity reduction in year j (%);

l: Year of commercial operation of power plants (starting from commercial commencement date of power plants). The first commercial operation year of power plants start from commercial commencement date of the first generator groups to the end of the first commercial operation year, l = 1);

m: Order of payment year starting from the base year (in case of the base year, m = 1).”

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



“6. In case a power plant has entered into PPAs, the case where the parties must negotiate in order to revise formula of variable cost components adjusted according to other variations of power plants is specified under Point c Clause 3 Article 15 hereof.”

7. Amend Point c Clause 1.3 Section I of Appendix V of the sample Power Purchase Agreement attached to the Circular as follows:

“c) Components of variable costs adjusted by other variations:

Components of variable costs adjusted according to other variations of power plants in the year j VCkj (VND/KWh) is determined using the following formula:

VCkj = VCkb x (1 + (l - 1) x kHS) x (1 + i)m-1

 In which:

VCkb: Components of variable costs adjusted by other variations of power plants in the base year is … (VND/kWh);

kHS: Percentage of capacity reduction in year j (%);

l: Year of commercial operation of power plants (starting from commercial commencement date of power plants). The first commercial operation year of power plants start from commercial commencement date of the first generator groups to the end of the first commercial operation year, l = 1);

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



i: Inflation rates of components of variable prices adjusted according to other variations based on rates under Appendix I hereof.

Article 3. Entry into force

1. This Circular comes into force from December 28, 2022.

2. Annul Article 4 of Circular No. 57/2014/TT-BCT dated December 18, 2014 of the Minister of Industry and Trade.

3. Annul Article 27 of Circular No. 57/2020/TT-BCT dated December 31, 2020 of the Minister of Industry and Trade.

4. Difficulties that arise during the implementation of this Circular should be reported to the ERAV or the Ministry of Industry and Trade for consideration./.

 

 

PP. MINISTER
DEPUTY MINISTER




Dang Hoang An

...

...

...

Please sign up or sign in to your TVPL Pro Membership to see English documents.



Từ khóa: Thông tư 31/2022/TT-BCT, Thông tư số 31/2022/TT-BCT, Thông tư 31/2022/TT-BCT của Bộ Công Thương, Thông tư số 31/2022/TT-BCT của Bộ Công Thương, Thông tư 31 2022 TT BCT của Bộ Công Thương, 31/2022/TT-BCT

File gốc của Thông tư 31/2022/TT-BCT của Bộ Công Thương về việc sửa đổi, bổ sung một số điều của Thông tư 57/2014/TT-BCT ngày 19/12/2014 của Bộ trưởng Bộ Công Thương quy định phương pháp, trình tự xây dựng và ban hành khung giá phát điện và Thông tư 57/2020/TT-BCT ngày 31/12/2020 của Bộ trưởng Bộ Công Thương quy định phương pháp … đang được cập nhật.

Điện lực

  • Quyết định 3568/QĐ-UBND của Ủy ban nhân dân Thành phố Hồ Chí Minh về việc bãi bỏ Chỉ thị 01/2013/CT-UBND ngày 03/01/2013 của Ủy ban nhân dân Thành phố Hồ Chí Minh về tăng cường quản lý Nhà nước trong công tác bảo vệ an toàn công trình điện cao áp và an toàn điện trong nhân dân trên địa bàn Thành phố Hồ Chí Minh
  • Thông tư 31/2022/TT-BCT của Bộ Công Thương về việc sửa đổi, bổ sung một số điều của Thông tư 57/2014/TT-BCT ngày 19/12/2014 của Bộ trưởng Bộ Công Thương quy định phương pháp, trình tự xây dựng và ban hành khung giá phát điện và Thông tư 57/2020/TT-BCT ngày 31/12/2020 của Bộ trưởng Bộ Công Thương quy định phương pháp ...
  • Quyết định 33/2022/QĐ-UBND của Ủy ban nhân dân tỉnh Bạc Liêu về việc bãi bỏ Quyết định 10/2019/QĐ-UBND ngày 26/6/2019 của Ủy ban nhân dân tỉnh Bạc Liêu ban hành Quy định về kỹ thuật an toàn điện sau công tơ
  • Thông tư 29/2022/TT-BCT của Bộ Công Thương về việc ban hành Quy chuẩn kỹ thuật quốc gia về an toàn đối với rơle bảo vệ rò điện điện áp đến 1 140V phòng nổ sử dụng trong mỏ hầm lò
  • Thông tư 38/2022/TT-BCT của Bộ Công Thương về việc bãi bỏ khoản 1 Điều 2 Thông tư 19/2014/TT-BCT ngày 18/6/2014 của Bộ trưởng Bộ Công Thương ban hành mẫu hợp đồng mua bán điện phục vụ mục đích sinh hoạt
  • Thông tư 42/2022/TT-BCT của Bộ Công Thương quy định về kiểm tra hoạt động điện lực và sử dụng điện, giải quyết tranh chấp hợp đồng mua bán điện
  • Thông tư 28/2022/TT-BCT của Bộ Công Thương về việc ban hành Quy chuẩn kỹ thuật quốc gia về an toàn đối với tủ phân phối điện áp 6 kV phòng nổ sử dụng trong mỏ hầm lò
  • Thông tư 36/2022/TT-BCT của Bộ Công Thương về việc ban hành Bộ định mức dự toán chuyên ngành lắp đặt đường dây tải điện và lắp đặt trạm biến áp
  • Thông tư 39/2022/TT-BCT của Bộ Công Thương về việc sửa đổi, bổ sung một số điều của Thông tư 25/2016/TT-BCT ngày 30/11/2016 của Bộ trưởng Bộ Công Thương quy định hệ thống điện truyền tải, Thông tư 39/2015/TT-BCT ngày 18/11/2015 của Bộ trưởng Bộ Công Thương quy định hệ thống điện phân phối và Thông tư 30/2019/TT-BCT ...
  • Quyết định 2976/QĐ-BCT của Bộ Công Thương về việc phê duyệt Kế hoạch cung cấp điện và vận hành hệ thống điện Quốc gia năm 2023

Thông tư 31/2022/TT-BCT của Bộ Công Thương về việc sửa đổi, bổ sung một số điều của Thông tư 57/2014/TT-BCT ngày 19/12/2014 của Bộ trưởng Bộ Công Thương quy định phương pháp, trình tự xây dựng và ban hành khung giá phát điện và Thông tư 57/2020/TT-BCT ngày 31/12/2020 của Bộ trưởng Bộ Công Thương quy định phương pháp …

- File PDF đang được cập nhật

- File Word Tiếng Việt đang được cập nhật

Chính sách mới

  • Giá xăng hôm nay tiếp tục giảm sâu còn hơn 25.000 đồng/lít
  • Nhiệm vụ quyền hạn của hội nhà báo
  • Gia hạn thời gian nộp thuế giá trị gia tăng năm 2023
  • Thủ tục đăng ký kết hôn trực tuyến
  • Sửa đổi, bổ sung một số quy định hướng dẫn về đăng ký doanh nghiệp
  • Tiêu chí phân loại phim 18+
  • Danh mục bệnh Nghề nghiệp được hưởng BHXH mới nhất
  • Quy chế tổ chức và hoạt động của trường phổ thông dân tộc nội trú
  • Điều kiện bổ nhiệm Hòa giải viên tại Tòa án
  • Văn bản nổi bật có hiệu lực tháng 5/2023

Tin văn bản

  • Chính sách mới có hiệu lực từ ngày 01/07/2022
  • Đầu tư giải phóng mặt bằng để thực hiện dự án Khu dân cư nông thôn mới Phú Khởi, xã Thạnh Hòa, huyện Phụng Hiệp
  • Danh mục mã hãng sản xuất vật tư y tế để tạo lập mã vật tư y tế phục vụ quản lý và giám định, thanh toán chi phí khám bệnh, chữa bệnh bảo hiểm y tế
  • Từ 11/7/2022: Thuế bảo vệ môi trường đối với xăng còn 1.000 đồng/lít
  • Người lao động đi làm việc tại Hàn Quốc được vay đến 100 triệu đồng để ký quỹ
  • HOT: Giá xăng, dầu đồng loạt giảm hơn 3.000 đồng/lít
  • Hỗ trợ đơn vị y tế công lập thu không đủ chi do dịch Covid-19
  • Hỗ trợ phát triển sản xuất nông nghiệp thuộc Chương trình mục tiêu quốc gia giảm nghèo bền vững
  • Phấn đấu đến hết 2025, nợ xấu của toàn hệ thống tổ chức tín dụng dưới 3%
  • Xuất cấp 432,78 tấn gạo từ nguồn dự trữ quốc gia cho tỉnh Bình Phước

Tóm tắt

Cơ quan ban hành Bộ Công Thương
Số hiệu 31/2022/TT-BCT
Loại văn bản Thông tư
Người ký Đặng Hoàng An
Ngày ban hành 2022-11-08
Ngày hiệu lực 2022-12-28
Lĩnh vực Điện lực
Tình trạng Còn hiệu lực

Văn bản Bãi bỏ

  • Thông tư 57/2014/TT-BCT quy định phương pháp, trình tự xây dựng và ban hành khung giá phát điện do Bộ trưởng Bộ Công Thương ban hành
  • Thông tư 57/2020/TT-BCT quy định về phương pháp xác định giá phát điện, hợp đồng mua bán điện do Bộ Công thương ban hành

Văn bản Bổ sung

  • Thông tư 57/2020/TT-BCT quy định về phương pháp xác định giá phát điện, hợp đồng mua bán điện do Bộ Công thương ban hành

Văn bản Sửa đổi

  • Thông tư 57/2014/TT-BCT quy định phương pháp, trình tự xây dựng và ban hành khung giá phát điện do Bộ trưởng Bộ Công Thương ban hành
  • Nghị định 137/2013/NĐ-CP hướng dẫn Luật điện lực và Luật điện lực sửa đổi

DỮ LIỆU PHÁP LUẬT - Website hàng đầu về văn bản pháp luật Việt Nam, Dữ Liệu Pháp Luật cung cấp cơ sở dữ liệu, tra cứu Văn bản pháp luật miễn phí.

Website được xây dựng và phát triển bởi Vinaseco Jsc - Doanh nghiệp tiên phong trong lĩnh vực chuyển đổi số lĩnh vực pháp lý.

NỘI DUNG

  • Chính sách mới
  • Tin văn bản
  • Kiến thức luật
  • Biểu mẫu
  • Media Luật

HỖ TRỢ KHÁCH HÀNG

  • Giới thiệu
  • Bảng giá
  • Hướng dẫn sử dụng
  • Chính sách bảo mật
  • Điều khoản sử dụng

CÔNG TY CỔ PHẦN PHÁT TRIỂN VÀ ỨNG DỤNG CÔNG NGHỆ SỐ VINASECO

Địa chỉ: Trần Vỹ, Mai Dịch, Cầu Giấy, Hà Nội, Việt Nam - Email: [email protected] - Website: vinaseco.vn - Hotline: 088.66.55.213

Mã số thuế: 0109181523 do Phòng DKKD Sở kế hoạch & Đầu tư Thành phố Hà Nội cấp ngày 14/05/2023

  • Trang chủ
  • Văn bản mới
  • Chính sách mới
  • Tin văn bản
  • Kiến thức luật
  • Biểu mẫu