CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK

Ceased operations; tax code closure completed
Tax code0107013273
Vietnamese nameCÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK
Abbreviated nameAK UNDERGROUND CONSTRUCTION SOLUTION DESIGN JOINT STOCK COMP
AddressSố 12, ngách 2, tổ 68, đường Tân Mai, Phường Tương Mai(Hết hiệu lực), TP Hà Nội, Việt Nam.
Legal representative Nguyễn Trúc Quỳnh
Business registration certificate issue date02/10/2015
Operations start date02/10/2015
Fiscal year end2026-12-31T00:00:00Z
Data updated20/09/2026 07:36

Business lines

M7110Architectural and engineering activities and related technical consultancy
F41000Construction of buildings
F42200Construction of utility projects
F42900Construction of other civil engineering projects
F43110Demolition
F43120Site preparation
F43210Electrical Installation
F4322Plumbing, Heating and Air-Conditioning Installation
F43290Other Building Services Installation
F43300Building Completion and Finishing
F43900Other Specialized Construction Activities
G4659Wholesale of other machinery and equipment
M74100Specialized design activities
N7730Renting of other machinery, equipment and tangible goods without operator
N81290Other building and industrial cleaning activities
N81300Landscape care and maintenance service activities

Frequently asked questions about CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK

When was the information for tax code 0107013273 last updated?
The data for CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK was last synced at 07:36 on 20/09/2026. If the entity has just changed its tax registration information, click "Update now" in the information table above to have the system fetch the latest data.
Does CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK have any other names?
Besides its full name, CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK is also registered under the name AK UNDERGROUND CONSTRUCTION SOLUTION DESIGN JOINT STOCK COMP. When searching, either this name or tax code 0107013273 will return the same result.
What information is needed to issue an invoice to CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK?
The three mandatory fields on an invoice are the entity name CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK, tax code 0107013273 and address Số 12, ngách 2, tổ 68, đường Tân Mai, Phường Tương Mai(Hết hiệu lực), TP Hà Nội, Việt Nam.. Check the tax code status again right before issuing an invoice, because an invoice issued to an entity that is not operating at its registered address risks being rejected at tax finalization.
What business lines does CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK operate in?
The main business line of CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK is Hoạt động kiến trúc và tư vấn kỹ thuật có liên quan. (business line code M7110). The entity is also registered for 15 additional business line(s), all listed under "Business lines" above.
Who is the legal representative of CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK?
The legal representative of CÔNG TY CỔ PHẦN THIẾT KẾ BIỆN PHÁP THI CÔNG PHẦN NGẦM AK is Nguyễn Trúc Quỳnh according to the tax registration information linked to tax code 0107013273.

Business statistics in Phường Tương Mai

5,207Total businesses
2,137Operating
3,017Ceased / suspended
0New in last 90 days

Across Thành phố Hà Nội: 262,559 businesses, of which 118,360 are operating.

Common business lines

Wholesale and retail trade; repair of motor vehicles and motorcycles1,824
Construction624
Manufacturing593
Professional, scientific and technical activities454
Administrative and support service activities363
Information and communication237

By legal form

Limited liability company3,022
Joint stock company1,955
Single-member limited liability company101
Sole proprietorship38
Cooperative18
Unclassified13

By status

Taxpayer issued tax code2,135
Not operating at registered address1,280
Ceased operations; tax code closure not yet completed1,229
Temporarily suspended operations321
Ceased operations; tax code closure completed187
Pending verification of operating status at registered address50

Businesses with legal representative "Nguyễn Trúc Quỳnh"

A total of 13 businesses share the same legal representative name

CÔNG TY TNHH MTV CHẠM CỌ

Tax code:0319586050
14G Đặng Văn Ngữ, Phường Phú Nhuận, TP Hồ Chí Minh, Việt Nam.

CÔNG TY TNHH MỘT THÀNH VIÊN XUẤT NHẬP KHẨU BELLA ACCESSORIES

Tax code:0318982171
Số 469 Nguyễn Hữu Thọ, Phường Tân Hưng, TP Hồ Chí Minh, Việt Nam.

CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ XUẤT NHẬP KHẨU KIM KHÁNH

Tax code:0110720949
Số 2 ngách 147/2 Tân Mai, Phường Hoàng Mai, TP Hà Nội, Việt Nam.

CÔNG TY TNHH TƯ VẤN ĐỊNH CƯ DU HỌC - GIÁO DỤC PLV

Tax code:0317630378
4A Tầng 4, Tòa Nhà Văn Phòng, Số 214 Hoàng Hoa Thám, Phường Bảy Hiền, TP Hồ Chí Minh, Việt Nam.

CÔNG TY TNHH S.H.E BEAUTY MASTER

Tax code:0317532356
103 Tân Vĩnh, Phường Khánh Hội, TP Hồ Chí Minh, Việt Nam.

CÔNG TY TNHH VNSTUDIO

Tax code:0316832170
72/8 Cô Giang, Phường Cầu Kiệu, TP Hồ Chí Minh, Việt Nam.

CÔNG TY TNHH PHỤ KIỆN NỘI THẤT LIÊN MINH

Tax code:0109341897
TT14-Lô 5 Dự án Khu nhà ở cho CBNV VPTƯ Đảng và Báo Nhân dân, đường Trịnh Văn Bô, Phường Xuân Phương, TP Hà Nội, Việt Nam.

CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ THƯƠNG MẠI SYLEX

Tax code:5400514584
Tầng 3, tòa nhà FLC Landmark Tower, đường Lê Đức Thọ, Phường Từ Liêm, TP Hà Nội, Việt Nam.

CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI TPG

Tax code:0109068398
Số 10E, ngõ 191, đường Phạm Văn Đồng, Phường Xuân Đỉnh, TP Hà Nội, Việt Nam.

CÔNG TY TNHH EMITECH

Tax code:2500627064
Khu 3, Xã Vĩnh Tường, Phú Thọ, Việt Nam.